4527 38th Avenue, Sacramento, CA 95824
DeterminedAPN 021-0153-101 · Application 11B7 · City of Sacramento · Conversion ADU · submitted Jul 6, 2026 · accepted complete Jul 6, 2026 by Maria Chen, Senior Plan Check Engineer (demo)
4527 38th Avenue, Sacramento, CA 95824
DeterminedSacramento · Conversion ADU · APN 021-0153-101 · R-1 · lot 6,400 sf · submitted Jul 6, 2026
Approve
67 of 67 cleared automatically · nothing left for you
All 67 checks passed with no failures, warnings, or flags of any kind. The application meets every applicable requirement as evaluated, and the computed recommendation is to approve. No outstanding issues require reviewer attention.
Checked by Greenlight AI · Claude Sonnet 4.6
Recommend-only AI — a human signs every determination
View the signed determinationMeasured against code
- Separationok
- Unit size600 sf
- Height1 ft
- Lot coverage25%40%
Parcel
- APN
- 021-0153-101
- Zone
- R-1
- Lot area
- 6,400 sq ft
- Overlays
- none
- GIS source
- demo-snapshot · fetched Jun 29, 2026
Application
- Standards path
- A — Local option (≤1,200 sf combined)
- Permit holder
- Licensed contractor
- Valuation
- $196,500
- New sq ft (living)
- 600 (600 first / 0 second)
- Garage sq ft
- 0
- Stories
- 1
- Description of work
- Construct a new detached two-story 1,150 sq ft accessory dwelling unit (2 bedroom / 1 bath) with all-electric appliances and 2.4 kW rooftop solar PV at the rear of the lot.
Documents
- 65 readings extractedShow readingsHide
- Readings · source · confidence
- Property address4527 38th Avenue, Sacramento, CA 95824from plan_set0.97
- Sheet indexyesfrom plan_set0.97
- Work descriptionConstruct a new detached two-story 1,150 sq ft accessory dwelling unit (2 bedroom / 1 bath) with all-electric appliances and 2.4 kW rooftop solar PV at the rear of the lot.from plan_set0.97
- Description of workConstruct a new detached two-story 1,150 sq ft accessory dwelling unit (2 bedroom / 1 bath) with all-electric appliances and 2.4 kW rooftop solar PV at the rear of the lot.from plan_set0.97
- OccupancyR-3from plan_set0.97
- Construction typeV-Bfrom plan_set0.97
- Sprinklersnofrom plan_set0.97
- Sprinklers primarynofrom plan_set0.97
- Toilet countsPrimary dwelling: 2 water closets; ADU: 1 water closetfrom plan_set0.97
- Building typeall_electricfrom plan_set0.97
- Designer declarationyesfrom plan_set0.97
- Codes declarationyesfrom plan_set0.97
- Code cycle declaration2025 California Building Standards Code (Title 24) with City of Sacramento amendments per Ord. 2025-0031 / City Code §15.04.050, effective 1-1-2026from plan_set0.97
- Utility connection pointsyesfrom plan_set0.97
- Abandoned septic noteno abandoned septic on sitefrom plan_set0.97
- Setbacks dimensionedyesfrom plan_set0.97
- North arrowyesfrom plan_set0.97
- Easements driveways drainageyesfrom plan_set0.97
- Sewer line detailsyesfrom plan_set0.97
- Side setback5from plan_set0.97
- Rear setback6.50from plan_set0.97
- Dist to front line72from plan_set0.97
- Separation from main house12from plan_set0.97
- Fire separation12from plan_set0.97
- ADU600from plan_set0.97
- ADU footprint600from plan_set0.97
- Room usesyesfrom plan_set0.97
- Dimensionsyesfrom plan_set0.97
- Window door sizes typesyesfrom plan_set0.97
- Ceiling height8'-0" typicalfrom plan_set0.97
- Ceiling height8from plan_set0.97
- Views nsewyesfrom plan_set0.97
- Height18from plan_set0.97
- Longitudinalyesfrom plan_set0.97
- Transverseyesfrom plan_set0.97
- Foundation footing detailsyesfrom plan_set0.97
- Roof ceiling framingyesfrom plan_set0.97
- Floor framingyesfrom plan_set0.97
- Braced shear wall plansyesfrom plan_set0.97
- Connection detailsyesfrom plan_set0.97
- Panel locations amperage busbaryesfrom plan_set0.97
- Switch receptacle lighting scaledyesfrom plan_set0.97
- Meter count2from plan_set0.97
- Certificates of complianceyesfrom plan_set0.97
- Code cycle2025 CEnCfrom plan_set0.97
- Climate zone12from plan_set0.97
- Cdd0183yesfrom plan_set0.97
- Utility equipment screenedyesfrom plan_set0.97
- Entrance faces roadway or open spaceyesfrom plan_set0.97
- Blank wall area240from plan_set0.97
- Mechanical equipment concealedyesfrom plan_set0.97
- Upper story side setback5from plan_set0.97
- Upper story rear setback6.50from plan_set0.97
- Upper story window recess or trimyesfrom plan_set0.97
- Module layoutyesfrom plan_set0.97
- One line diagramyesfrom plan_set0.97
- Spec sheetsyesfrom plan_set0.97
- Cec labelsyesfrom plan_set0.97
- Attachment detailsyesfrom plan_set0.97
- SMUD confirmation letteryesfrom plan_set0.97
- Has balconynofrom plan_set0.97
- Fencing in scopenofrom plan_set0.97
- ADU in front setbacknofrom plan_set0.97
- Dwelling unit separation detailyesfrom plan_set0.97
- Lot coverage25from plan_set0.97
Ask Greenlight●
Answers cite Sacramento's own rules. I can't predict approval — no one can.
Nothing needed your judgment — every applicable check cleared automatically.
67 of 67 cleared automatically
Documentary 50 · Objective 17 · Judgment 0 — each cited, each deterministic
Show all 67Hide
67 of 67 cleared automatically
Documentary 50 · Objective 17 · Judgment 0 — each cited, each deterministic
Each pass is the agent's call — open one to see its evidence, and override it if your judgment differs.
Official determination of record
approve
ApproveSigned by Maria Chen, Senior Plan Check Engineer (demo) · Jul 14, 2026, 11:51 PM
Letter of record
All automated checks passed with citations. Approved for issuance subject to standard conditions. (Demo determination.)
Starts a fresh check run for resubmission review — prior runs and this determination are preserved.