Jurisdiction coverage
Cities & permit types we cover.
Greenlight covers the jurisdictions and permit types below. Each entry is a tailored portal with city-specific rules, fees, forms, and statutory clocks — every rule cited to its primary source. The reference implementation is the first city in the list.
- Jurisdictions
- 2
- Permit types
- 2live
- Encoded rules
- 355live datasets
- Cited to source
- 90%320/355
| Jurisdiction | Detached ADU | Conversion ADU |
|---|---|---|
City of Sacramento Community Development Department | Live 170 rules | Live 153 rules |
City of Santa Rosa Planning & Economic Development | Live 32 rules | Not covered |
City of Sacramento
Community Development Department
Completeness clock
15 business daysGov. Code §66317
Decision clock
60 calendar daysGov. Code §66317
Coverage depth
- Detached ADU170 rules · 89% cited65 objective · 80 documentary · 25 judgmentStart
Browse the encoded rules
- PLANS file presentThree-PDF package table, PLANS row
- Plan-set cover sheet presentCover sheet (8 items)
- Site/plot plan presentSite / plot plan (6 items)
- Architectural set completeArchitectural
- Structural plan sheets presentStructural
- Electrical layout presentElectrical layout
- Full electrical plans per CDD-0212Electrical layout, item 3 (multi-meter setups per CDD-0212)
- Title 24 Certificates of Compliance incorporated into PLANS…Energy (CEnC, Part 6)
- CDD-0183 Residential CALGreen Mandatory Requirements Checklist in the…CALGreen (Part 11)
- CDD-0180 VOC & Formaldehyde Limits documentation per scopeCALGreen compliance documents (CDD-0180 — appears on CDD-0316 only, not CDD-0312)
- PV solar plansPV plans (6 items)
- MWELO landscape documentsMWELO / landscape row, CDD-0312 (packet dossier §6.9); SCC § 15.92 App. D; § 15.92.070
- Completed CDD-0200 rendered into the APP fileThree-PDF package table, APP row
- Copy of the CDD-0312 submittal checklist included in…Three-PDF package table, APP row
- Structural calculations in SUPPThree-PDF package table, SUPP row; CDD-0312 scope-triggered SUPP docs
- Truss calculations in SUPPThree-PDF package table, SUPP row; CDD-0312 scope-triggered SUPP docs
- Soils/geotechnical report in SUPPCDD-0312 scope-triggered SUPP docs (soils reports mandatory 'for all subdivisions'); SUPP row
- Fire-sprinkler calculations and cut sheets in SUPPThree-PDF package table, SUPP row
- Water supply test in SUPPThree-PDF package table, SUPP row
- CDD-0197 Special Inspection form in SUPPThree-PDF package table, SUPP row; CDD-0312 scope-triggered SUPP docs
…and 150 more in this dataset — every one runs on each submission.
- Conversion ADU153 rules · 89% cited45 objective · 81 documentary · 27 judgmentStart
Browse the encoded rules
- PLANS file presentThree-PDF package table, PLANS row
- Plan-set cover sheet presentCover sheet (8 items)
- Site/plot plan presentSite / plot plan (6 items)
- Architectural set completeArchitectural
- Structural plan sheets presentStructural
- Electrical layout presentElectrical layout
- Full electrical plans per CDD-0212Electrical layout, item 3 (multi-meter setups per CDD-0212)
- Title 24 Certificates of Compliance incorporated into PLANS…Energy (CEnC, Part 6)
- CDD-0183 Residential CALGreen Mandatory Requirements Checklist in the…CALGreen (Part 11)
- CDD-0180 VOC & Formaldehyde Limits documentation per scopeCALGreen compliance documents (CDD-0180 — appears on CDD-0316 only, not CDD-0312)
- PV solar plansPV plans (6 items)
- MWELO landscape documentsMWELO / landscape row, CDD-0312 (packet dossier §6.9); SCC § 15.92 App. D; § 15.92.070
- Completed CDD-0200 rendered into the APP fileThree-PDF package table, APP row
- Copy of the CDD-0312 submittal checklist included in…Three-PDF package table, APP row
- Structural calculations in SUPPThree-PDF package table, SUPP row; CDD-0312 scope-triggered SUPP docs
- Truss calculations in SUPPThree-PDF package table, SUPP row; CDD-0312 scope-triggered SUPP docs
- Soils/geotechnical report in SUPPCDD-0312 scope-triggered SUPP docs (soils reports mandatory 'for all subdivisions'); SUPP row
- Fire-sprinkler calculations and cut sheets in SUPPThree-PDF package table, SUPP row
- Water supply test in SUPPThree-PDF package table, SUPP row
- CDD-0197 Special Inspection form in SUPPThree-PDF package table, SUPP row; CDD-0312 scope-triggered SUPP docs
…and 133 more in this dataset — every one runs on each submission.
City of Santa Rosa
Planning & Economic Development
Completeness clock
15 business daysGov. Code §66317
Decision clock
60 calendar daysGov. Code §66317; srcity.org plan-check-turnaround 2025-11-05
Coverage depth
- Detached ADU32 rules · 100% cited5 objective · 10 documentary · 17 judgmentStart
Browse the encoded rules
- Statewide-exemption unit qualifier§66323(a)(2), (b)
- Protected-envelope qualifier )§66321(b)(3)
- No local objective standard beyond §66323 may apply…§66323(b)
- State size floor§66321(b)(2)(A)–(B)
- Maximum interior floor area§20-42.130(E)(3)(a)
- Maximum height§20-42.130(E)(4)(a)
- One-story height limit and state floor§20-42.130(E)(4)(a); §66321(b)(4)
- Side setback§20-42.130(E)(2)(a)(1)
- Rear setback§20-42.130(E)(2)(a)(1)
- Two-story side/rear setback§20-42.130(E)(2)(a)(2)
- Front setback§20-42.130(E)(2)(a)(1)
- 800-sf safe harbor§20-42.130(E)(1)
- Lot coverage§20-42.130(E)(5)
- Number per single-family lot§20-42.130(E)(9)(a)
- Parking§20-42.130(E)(10)
- Hillside§20-42.130(E)(12)(b)
- Creekside§20-42.130(E)(14)(b)
- No short-term rental§20-42.130(B)(4)
- No separate sale§20-42.130(B)(5)
- Architectural compatibility§20-42.130(E)(6)
…and 12 more in this dataset — every one runs on each submission.
Built to add more cities & permit types
Each jurisdiction and permit type above is a self-contained dataset — adding the next one is new data and a registry entry, with no change to the engine, the review pipeline, or these portals.