1684 Fernwood Street, Sacramento, CA 95822
DeterminedAPN 008-0241-019Zone R-1
demo-snapshot · fetched Jun 10, 2026
City cycle targets for residential new buildings: 20/15/5 working days for cycles 1/2/3 (CDD-0294, rev 03-04-2026) — an expectation, not a promise.
Documents
Upload each document on its own — we extract and check per document. The slots mirror the city's three-file APP / PLANS / SUPP package; one-click export packaging is not in this demo yet. PDF only; signature pages must be wet-signed and scanned.
APP — application forms & signatures
Mirrors the city's merged APP file · size cap 50 MB (CDD-0316).
Application form (portal-generated)
RequiredSystem slot: your form answers are this document's data. Rendering the filled CDD-0200 PDF is part of export packaging, which is deferred — not a user upload.
1684-fernwood-st-cyc1-cdd0200-rendered.pdfv1uploaded May 20, 2026
Nothing to upload here — this slot is the city application form itself, and your form answers are its data. Rendering the filled PDF is part of export packaging, which is not in this demo yet; the form data remains the authority.
Contractor's Declaration — signature page (wet-signed scan)
Not required for this applicationWet signature required: print the page the portal generates, sign in ink, scan, and upload. Electronic signatures are rejected (EPC Quick Reference p.3).
Agent signing requires CDD-0196 on file. Print the page the portal generates, sign in ink, scan, upload.
Owner-Builder Declaration — signature page (wet-signed scan)
Required — triggered by your answersWet signature required: print the page the portal generates, sign in ink, scan, and upload. Electronic signatures are rejected (EPC Quick Reference p.3).
Agent signing requires CDD-0204 on file. Print, ink-sign, scan, upload.
1684-fernwood-st-cyc1-owner-builder-declaration-wet-signed.pdfv1uploaded May 22, 2026
Workers' Compensation declaration — signature page (wet-signed scan)
RequiredWet signature required: print the page the portal generates, sign in ink, scan, and upload. Electronic signatures are rejected (EPC Quick Reference p.3).
1684-fernwood-st-cyc1-workers-comp-wet-signed.pdfv1uploaded May 22, 2026
Final Certification — signature page (wet-signed scan)
RequiredWet signature required: print the page the portal generates, sign in ink, scan, and upload. Electronic signatures are rejected (EPC Quick Reference p.3).
1684-fernwood-st-cyc1-final-cert-wet-signed.pdfv1uploaded May 22, 2026
CDD-0220 Owner-Builder Notice, Acknowledgement, Verification & Authorization (wet-signed scan)
Required — triggered by your answersWet signature required: print the page the portal generates, sign in ink, scan, and upload. Electronic signatures are rejected (EPC Quick Reference p.3).
12 initialed acknowledgments + property address + owner signature. Owner's driver's license / notarization / other acceptable verification is presented at issuance; permit will not issue without it.
1684-fernwood-st-cyc1-cdd0220-owner-builder-wet-signed.pdfv1uploaded May 22, 2026
CDD-0204 Agent for Owner Authorization (wet-signed scan)
As neededWet signature required: print the page the portal generates, sign in ink, scan, and upload. Electronic signatures are rejected (EPC Quick Reference p.3).
Required when any owner-side signature is executed by an agent (cert_relationship is not the owner on the owner branch, or the agent flag is set on the owner-builder declaration).
CDD-0196 Agent Authorization for the Contractor (wet-signed scan)
As neededWet signature required: print the page the portal generates, sign in ink, scan, and upload. Electronic signatures are rejected (EPC Quick Reference p.3).
Required when the contractor-side signer is not on the CSLB Personnel List (agent flag on the contractor declaration).
CDD-0104 Address Request Form
RequiredAlways required for a detached new-construction ADU: a new address is required for each attached and detached ADU (Resolution 2009-0518). Submit at time of application; can take up to 4 weeks; the city tracks it as its own ADR- record.
1684-fernwood-st-cyc1-cdd0104-address-request.pdfv1uploaded May 22, 2026
CDD-0410 Regulated Affordable Housing form
Not required for this applicationCDD-0937 SB-937 Qualifying Project form
Not required for this applicationCDD-0452 Reduced STA Fees form
Not required for this applicationSubmittal checklist copy (CDD-0312)
Required1684-fernwood-st-cyc1-cdd0312-checklist.pdfv1uploaded May 22, 2026
Planning exemption documentation
As neededInclude if provided.
PLANS — the plan set
One vector PDF exported directly from CAD · size cap 300 MB (coordinate with [email protected] if larger).
Plan set (one PDF: cover sheet through PV plans)
RequiredContent checklist — what the city checks this file for
- Cover sheet: address; sheet index; detailed description of work; occupancy group/use (typically R-3 or U) + construction type + fire sprinklers yes/no for all buildings on parcel; toilet counts for all buildings when 2+ buildings on the parcel have water closets; Building Type (All-Electric or Mixed-Fuel); declaration of designer, or licensed professional's signed stamp if scope requires; declaration of state and local codes & cycle (2025 Title 24 + City amendments per ORD 2025-0031 / City Code §15.04.050, effective 1-1-2026) CDD-0312
- Site / plot plan: location/size/material of all utility connection points (water, sewer, gas if applicable) + main electrical and sub-panel locations, amperage, bus-bar rating, wiring methods for all buildings onsite; abandoned septic noted if present; dimensioned building placement (setbacks); north arrow; all easements, driveway locations, drainage arrows; sewer line material, location, slope, and tie-in method CDD-0312
- Architectural: floor plan with each room labeled with proposed use, dimensions, window/door sizes and types, ceiling height; elevations of all four views (N/S/E/W); longitudinal and transverse sections CDD-0312
- Structural: foundation with footing details; roof/ceiling framing with joist and rafter sizes/spacing; floor framing with joist size/spacing, braced-wall/shear-wall plans, connection details CDD-0312
- Electrical layout: location, amperage, bus-bar rating of all service/sub panels on the parcel; switch, receptacle, lighting locations, scaled for code verification; multi-meter setups (3+ meters on one SMUD service) per CDD-0212 — full electrical plans CDD-0312
- T-24 energy: CEnC (Title 24 Part 6) compliance documents; Certificates of Compliance incorporated into PLANS as plan sheets — not loose attachments CDD-0312; CDD-0316 p.2
- CALGreen: CDD-0183 Residential CALGreen Mandatory Requirements Checklist in the plan set (applies to conditioned area); CDD-0180 VOC & Formaldehyde Limits per scope (CDD-0180 appears on CDD-0316 only, not CDD-0312) CDD-0312; CDD-0316
- PV solar: site/roof plan with module layout + equipment locations; one-line diagram + main panel location/amperage/bus-bar; spec sheets for all PV equipment; CEC 690.53/690.54 labels; module attachment details; SMUD confirmation letter CDD-0312
1684-fernwood-st-cyc1-plan-set.pdfv1uploaded May 22, 2026
Plan data — declare what your plans show from plan_set
These values come straight off your drawings; the automated checks evaluate them against the cited standards. Declared values are verified during city plan review — and replaced by AI extraction when configured. Leave blank anything that doesn't apply.
SUPP — supplemental documents
As-needed calculations and reports · size cap 150 MB.
Structural calculations
As neededAs needed.
Truss calculations
As neededAs needed.
Soils report
As neededAs needed — CDD-0312 mandates soils reports for all subdivisions; for a single-lot detached ADU this is an as-needed item, surfaced by the assistant when the design suggests it (e.g. expansive soils per CRC R401.4), never silently required.
Fire sprinkler calculations
As neededAs needed.
Water supply test
As neededAs needed.
CDD-0197 Special Inspection
As neededAs needed.
CDD-0227 Drainage / Encroachment
As neededAs needed.
CDD-0252 Lot Lines Certification
As neededAs needed.
SWPPP (Storm Water Pollution Prevention Plan)
As neededAs needed.