Application review
1684 Fernwood Street, Sacramento, CA 95822
DeterminedAPN 008-0241-019 · app_fc8e4e36-d62a-404f-a74b-51cadf24056e · submitted May 22, 2026 · accepted complete May 22, 2026
City cycle targets for residential new buildings: 20/15/5 working days for cycles 1/2/3 (CDD-0294, rev 03-04-2026) — an expectation, not a promise.
Parcel
- APN
- 008-0241-019
- Zone
- R-1
- Lot area
- 5,200 sq ft
- Overlays
- none
- GIS source
- demo-snapshot · fetched Jun 10, 2026
Application
- Standards path
- B — State standards (≤800 sf, 18 ft, 4-ft setbacks)
- Permit holder
- Property owner
- Valuation
- $123,000
- New sq ft (living)
- 720 (720 first / 0 second)
- Garage sq ft
- 0
- Stories
- 1
- Description of work
- Construct a new detached single-story 720 sq ft accessory dwelling unit (1 bedroom / 1 bath) under the state ADU standards, all-electric with 2.0 kW rooftop solar PV.
Documents
- 1684-fernwood-st-cyc1-cdd0104-address-request.pdfcdd0104 · v1 · uploaded May 22, 2026Download
- 1684-fernwood-st-cyc1-cdd0200-rendered.pdfcdd0200_rendered · v1 · uploaded May 20, 2026Download
- 1684-fernwood-st-cyc1-cdd0220-owner-builder-wet-signed.pdfcdd0220 · v1 · uploaded May 22, 2026Download
- 1684-fernwood-st-cyc1-final-cert-wet-signed.pdffinal_certification_signed · v1 · uploaded May 22, 2026Download
- 1684-fernwood-st-cyc1-owner-builder-declaration-wet-signed.pdfowner_builder_declaration_signed · v1 · uploaded May 22, 2026Download
- 1684-fernwood-st-cyc1-plan-set.pdfplan_set · v1 · uploaded May 22, 2026Download
- Readings · source · confidence
- cover_sheet.address1684 Fernwood Street, Sacramento, CA 95822from plan_set0.97
- cover_sheet.sheet_indexyesfrom plan_set0.97
- cover_sheet.work_descriptionConstruct a new detached single-story 720 sq ft accessory dwelling unit (1 bedroom / 1 bath) under the state ADU standards, all-electric with 2.0 kW rooftop solar PV.from plan_set0.97
- cover_sheet.description_of_workConstruct a new detached single-story 720 sq ft accessory dwelling unit (1 bedroom / 1 bath) under the state ADU standards, all-electric with 2.0 kW rooftop solar PV.from plan_set0.97
- cover_sheet.occupancyR-3from plan_set0.97
- cover_sheet.construction_typeV-Bfrom plan_set0.97
- cover_sheet.sprinklersnofrom plan_set0.97
- cover_sheet.sprinklers_primarynofrom plan_set0.97
- cover_sheet.toilet_countsPrimary dwelling: 2 water closets; ADU: 1 water closetfrom plan_set0.97
- cover_sheet.building_typeall_electricfrom plan_set0.97
- cover_sheet.designer_declarationyesfrom plan_set0.97
- cover_sheet.codes_declarationyesfrom plan_set0.97
- cover_sheet.code_cycle_declaration2025 California Building Standards Code (Title 24) with City of Sacramento amendments per Ord. 2025-0031 / City Code §15.04.050, effective 1-1-2026from plan_set0.97
- site_plan.utility_connection_pointsyesfrom plan_set0.97
- site_plan.abandoned_septic_noteno abandoned septic on sitefrom plan_set0.97
- site_plan.setbacks_dimensionedyesfrom plan_set0.97
- site_plan.north_arrowyesfrom plan_set0.97
- site_plan.easements_driveways_drainageyesfrom plan_set0.97
- site_plan.sewer_line_detailsyesfrom plan_set0.97
- site_plan.side_setback_ft4.50from plan_set0.97
- site_plan.rear_setback_ft5from plan_set0.97
- site_plan.dist_to_front_line70from plan_set0.97
- site_plan.separation_primary_ft10from plan_set0.97
- site_plan.fire_separation_ft10from plan_set0.97
- site_plan.adu_sqft720from plan_set0.97
- site_plan.adu_footprint_sqft720from plan_set0.97
- floor_plan.room_usesyesfrom plan_set0.97
- floor_plan.dimensionsyesfrom plan_set0.97
- floor_plan.window_door_sizes_typesyesfrom plan_set0.97
- floor_plan.ceiling_height8'-0" typicalfrom plan_set0.97
- floor_plan.ceiling_height_ft8from plan_set0.97
- elevations.views_nsewyesfrom plan_set0.97
- elevations.height_ft15from plan_set0.97
- sections.longitudinalyesfrom plan_set0.97
- sections.transverseyesfrom plan_set0.97
- structural_plans.foundation_footing_detailsyesfrom plan_set0.97
- structural_plans.roof_ceiling_framingyesfrom plan_set0.97
- structural_plans.floor_framingyesfrom plan_set0.97
- structural_plans.braced_shear_wall_plansyesfrom plan_set0.97
- structural_plans.connection_detailsyesfrom plan_set0.97
- electrical_plan.panel_locations_amperage_busbaryesfrom plan_set0.97
- electrical_plan.switch_receptacle_lighting_scaledyesfrom plan_set0.97
- electrical_plan.meter_count2from plan_set0.97
- title24_report.certificates_of_complianceyesfrom plan_set0.97
- title24_report.code_cycle2025 CEnCfrom plan_set0.97
- title24_report.climate_zone12from plan_set0.97
- calgreen_checklist.cdd0183yesfrom plan_set0.97
- pv_plans.module_layoutyesfrom plan_set0.97
- pv_plans.one_line_diagramyesfrom plan_set0.97
- pv_plans.spec_sheetsyesfrom plan_set0.97
- pv_plans.cec_labelsyesfrom plan_set0.97
- pv_plans.attachment_detailsyesfrom plan_set0.97
- pv_plans.smud_confirmation_letteryesfrom plan_set0.97
- site_plan.has_balconynofrom plan_set0.97
- site_plan.fencing_in_scopenofrom plan_set0.97
- site_plan.adu_in_front_setbacknofrom plan_set0.97
- 1684-fernwood-st-cyc1-cdd0312-checklist.pdfsubmittal_checklist_copy · v1 · uploaded May 22, 2026Download
- 1684-fernwood-st-cyc1-workers-comp-wet-signed.pdfworkers_comp_signed · v1 · uploaded May 22, 2026Download
Agent recommendation
approve
ApproveAll 59 automated checks passed with no flags or failures. There are no outstanding issues identified by the rule engine, and the computed recommendation is to approve this permit application.
pipeline-v1 · rules sacramento-adu-v1 · claude-sonnet-4-6 · started May 22, 2026, 2:26 AM · finished May 22, 2026, 2:26 AM
Signed determination
ApproveSigned by Maria Chen, Senior Plan Check Engineer (demo) at May 29, 2026, 2:26 AM
All automated checks passed with citations. Approved for issuance subject to standard conditions. (Demo determination.)
Starts a fresh check run for resubmission review — prior runs and this determination are preserved.
Documentary
completeness — decided deterministicallyObjective
measured against code values — decided deterministicallyJudgment
never auto-decided — flagged for your reviewNo judgment checks applied to this application.